Robert J. Richardson Middle School (SW Area School)
Project: | Robert J. Richardson Middle School (SW Area School) |
---|---|
Address: | 6018 South Karlov Avenue |
Community: | West Lawn |
Ward: | 23 |
Description: | The Project consists of construction of a new 135,000 square foot, 1500 student, 3-story middle school. The school will include 48 classrooms, 3 special needs classrooms 3 breakout spaces, 4 science classrooms, 4 computer classrooms, 2 art classrooms, 1 music classroom, a dining center, a hybrid kitchen, gymnasium, library, and administrative suite. Building construction will be concrete and steel frame atop spread concrete footings and an exterior envelope consisting of cold formed steel studs and masonry veneer. Site improvements comprising of a new parking lot, storm water management improvements, new sidewalks, new vehicular drive, artificial athletic turf fields and a refuse / delivery.
LEED Features:
Social Media: |
Contract Information: |
|
Note: The street view image is an approximate location and view point. Use the arrows on the top left corner of the street view () to rotate the image or use the arrows on the streets to move the view point.