Contract Details
Request for Qualifications
Ogden Replacement Elementary School24 West WaltonInvitation for Sub-Contractors to Pre-Qualify
- 02900 Landscaping
- 07500 Roofing
- 07800 Spray-On-Waterproofing
- 09100 Gypsum Board Partitions, Plaster & Ceilings
Project Description: The Project site is located between N. State Street and N. Dearborn Street and W. Walton Street and W. Oak Street in Chicago. The building is approximately 156,000 gross square feet. One sub grade level of approximately 45,000 SF will be used for parking, storage and building maintenance. The first level at grade will be the main entry with Principal’s office, 6 Pre-K class rooms, dock and service areas including the Kitchen. The second level will include 12 classrooms, a computer and science lab, art room and a 2 story Gymnasium with raised platform stage along with mechanical rooms. The 3rd floor has another 12 classrooms, the library, music room, staff lounge and mechanical rooms. The Roof plan has a 3 access points including an elevator override along with an outdoor playground and vegetative roofs. The building cladding is masonry, aluminum and glass panels. Construction will start in November 2009 with substantial completion scheduled for June 30th, 2011, with academic classes starting September 6th, 2011.
Pre-Qualification Checklist Due Date: Subcontractor pre-qualification checklist is due on Monday, January 25, 2010 at 3:00 PM CST. The prequalification checklist is to be either sent, faxed, or emailed to Turner Construction Company, attention Pete Woeste. If your firm will submit a pre-qualification checklist for this project, please notify us by completing the attached "Request to Pre-Qualification" Form and faxing it back to me at fax number 312-327-2800. We also ask that you return this form if you do not intend on submitting a pre-qualification checklist.
Documents: