Contract Details
Contract PS1805 -
William Jones College Preparatory High School
700 South State Street
Stuctural Steel
Project Description: A new non-prototypical high school for 1,200 selective-enrollment and community students, which includes below-grade parking, general classrooms, science labs, world language/computer classrooms, art classrooms, music classrooms, administration suite, nurses/student services suite, student dining area with servery and full cooking kitchen, multi-purpose room, library, gymnasium, natatorium, separate auditorium, and building support spaces. This replacement High School to be constructed to the south of the existing Jones College Prep High School. This project will seek LEED for Schools Silver certification, and will feature a 50% green roof.
Eligible to Bid:
0500.000 Structural Steel
- Schuff Steel
- Munster Steel
- Hammerts Iron
- Zalk Josephs
- Ozark Steel Fabrications
- LeJeune Steel Company
- Lenex Steel Company
- Chicago Decking
- Cives
Bid Opening:
Subcontractor bids are due on Wednesday, April 27, 2011 at 1:00 PM CST. Two copies of the bids and all required attachments are to be either sent or hand-delivered to Bovis Lend Lease, Inc. in a sealed envelope. Late bids will not be accepted. The bid opening will be held at Bovis Lend Lease office located at One North Wacker Drive, Suite 850, Chicago Illinois, 60606. Note: Date Has Changed.
Addendum:
- Addendum 1 Structural Steel (3/29/11).
- Addendum 2 Structural Steel (4/6/11).
- Addendum 3 Structural Steel (4/14/11).
- Addendum 4 Structural Steel (4/20/11).
- Addendum 5 Structural Steel (4/25/11). (Revised)