Contract Details
Contract PS1805 -
William Jones College Preparatory High School
700 South State Street
Excavation & Underground Electrical
Project Description:
A new non-prototypical high school for 1,200 selective-enrollment and community students, which includes below-grade parking, general classrooms, science labs, world language/computer classrooms, art classrooms, music classrooms, administration suite, nurses/student services suite, student dining area with servery and full cooking kitchen, multi-purpose room, library, gymnasium, natatorium, separate auditorium, and building support spaces. This replacement High School to be constructed to the south of the existing Jones College Prep High School. This project will seek LEED for Schools Silver certification, and will feature a 50% green roof.
Eligible to Bid:
0222.000 Excavation
- Roy Strom
- Rausch Construction Company
- John Keno & Company
- Lindahl Brothers
- Budron
- Vegter Excavation
- Divine Brothers Electric Company
- Public Electric Construction
- Horizon Contractors Inc.
- Broadway Electric
- Connelly Electric
Bid Opening:
Subcontractor bids are due on Tuesday, February 22, 2011 at 1:00 PM CST. Two copies of the bids and all required attachments are to be either sent or hand-delivered to Bovis Lend Lease, Inc. in a sealed envelope. Late bids will not be accepted. The bid opening will be held at Bovis Lend Lease office located at One North Wacker Drive, Suite 850, Chicago Illinois, 60606. Note: Date Has Changed.
Addendum:
- Addendum 1 Excavation (1/31/11).
- Addendum 1 Underground Electrical (1/31/11).
- Addendum 2 Excavation (2/9/11).
- Addendum 2 Underground Electrical (2/9/11).
- Addendum 3 Excavation (2/14/11).
- Addendum 3 Underground Electrical (2/14/11).
- Addendum 4 Excavation (2/16/11).
- Addendum 4 Underground Electrical (2/16/11).
- Addendum 5 Excavation (2/18/11).
- Addendum 5 Underground Electrical (2/18/11).